California SB 1116 Lot Averaging in 2027
California SB 1116 lot averaging permits smaller parcels for eligible 2027 applications, while average sizes and other project requirements still apply.
A clearer view of housing.
Portland parking minimums are gone, but bike parking, access and other rules remain. See what applies October 8, 2026, and what changes in November.
Portland parking minimums were eliminated citywide in 2023, so the zoning code no longer requires a minimum number of car spaces for new housing. As of October 8, 2026, parking supplied voluntarily still must meet development standards, and bicycle parking, loading and other requirements can apply independently. The city’s parking overview identifies these remaining requirements.
For an infill project, evaluate the spaces, driveway and supporting infrastructure together before deciding whether to supply car parking. An optional stall can affect much more of the site than its painted rectangle.
Portland residential parking requirements distinguish houses, duplexes, triplexes and fourplexes from other development. Section 33.266.120 generally governs those smaller building types; Section 33.266.130 governs other development, with exceptions such as parking tracts. Identify the applicable section before selecting dimensions or drawing setbacks. Chapter 33.266
Check the base zone, overlays and plan district as part of the site’s review of zoning and land-use rules. Parking maximums can still limit the number supplied, and special geographic rules can supersede the general standards. The city’s June 2025 update packet includes the applicable maximum-parking tables and their qualifications.
On a preliminary plan, mark the permitted parking location, maneuvering space, pedestrian routes and landscaping before counting stalls. Surface parking can require perimeter and interior landscaping; larger lots face additional tree-canopy or solar requirements. These are separate design checks in the city’s parking standards overview.
Keep that marked-up plan with the rest of your buildable-lot due diligence. A zoning designation alone does not establish which parking layout can be approved.
A parking space on private land and a driveway crossing the public right-of-way involve separate approvals. Under Section 17.28.110, the city can require evidence that a proposed driveway reaches legal parking and maneuvering space. It can refuse a driveway permit when that evidence is missing.
The Portland Bureau of Transportation’s driveway rule, amended effective June 11, 2026, addresses location, width, sight distance and conflicts near intersections. The applicable dimensions depend on the residential development and access arrangement. Use that dated driveway rule when evaluating a curb crossing.
Sketch the vehicle’s complete path from street to stall, with trees, sidewalk crossings and nearby corners on the same drawing. If the access fails, moving the stall may be more useful than refining its dimensions.
The general bicycle-parking table lists Household Living sites with five or more units. Its short-term requirement is two spaces or one per 20 units, whichever is greater. Count units on the site rather than assuming each small building stands alone. Table 266-6
For long-term residential bicycle parking, temporary rates remain in effect until January 1, 2029: one space per unit in Standard A areas and 0.7 per unit in Standard B areas. Portland staff confirmed these rates in their August 11, 2026 presentation. These are baseline requirements; qualifying projects may obtain housing adjustments affecting bicycle-parking quantity or location.
Reserve usable space for storage and circulation early. The same presentation explains the separate concerns of security, weather protection and rack usability. A bicycle count written on a plan does not establish that the proposed storage works.
Loading has a different threshold. Under Section 33.266.310, an entirely residential building generally needs a loading space if it has more than 50 units, or more than 20 when its only street frontage is on a streetcar or light-rail alignment. Mixed-use buildings have additional rules. Loading standards
Record why loading is or is not triggered, and recheck that conclusion if the unit count, commercial floor area or street-frontage assumptions change.
Three reviews belong in the preliminary budget:
Include these elements when pricing the parking option. Paving costs alone do not capture the work involved.
Suppose a proposed new building contains six homes on a Standard A bicycle-parking site. Assume ordinary Household Living use, no approved adjustment and no special district provision changing the calculation.
The baseline is six long-term bicycle spaces under the temporary bicycle rates and two short-term spaces under Table 266-6. If the developer voluntarily supplies two residential car spaces, both need conduit under the EV-ready standards.
Early in residential development planning, compare two complete concepts: one without car parking and one showing both stalls, access, drainage and electrical work. Use local housing research to assess expected resident demand, then weigh it against construction cost and alternative uses of the land.
The City Council adopted Regulatory Improvement Code Amendment Package 11, or RICAP 11, on August 6, 2026. But Ordinance 192213 makes it effective November 1. Relevant amendments include:
These provisions appear in the ordinance’s July 2026 amended Exhibit B. They are adopted but not yet effective as of this article’s October 8 date.
Before committing to a purchase or final design, bring the proposed layout and unresolved code questions to a Portland planner and the project’s design professional. Have them confirm the standards and effective dates governing the application, especially where an assumption could change the project’s feasibility.
Portland’s zoning code does not require a minimum number of motor-vehicle parking spaces anywhere in the city. Developers who supply parking must still meet applicable standards for its design and location. City parking overview
The general Household Living bicycle-parking requirement starts at five units on a site. A fourplex alone on a site does not meet that trigger, but additional dwellings on the same site can change the answer. Table 266-6
The cited Portland zoning provision requires conduit that allows future installation of at least a Level 2 charger. That provision does not itself require an operating charger; the electrical design must also satisfy applicable electrical requirements. Chapter 33.266.110
No. Council adopted RICAP 11 on August 6, but its effective date is November 1, 2026. The adopted amendments are not yet part of the rules in force on October 8. Ordinance 192213
Written by
The Housing Current Editorial Team
Editorial Team
Reporting, analysis, and practical explainers across housing markets, mortgage finance, real estate business, investing, policy, and homebuilding.
California SB 1116 lot averaging permits smaller parcels for eligible 2027 applications, while average sizes and other project requirements still apply.
Oregon middle housing land division enables separate ownership. Check unit limits, utility and easement rules, and the steps from approval to recording.
Houston replat approval does not erase deed restrictions. Learn which records and development rules to check before marketing an infill or townhouse site.