Portland Parking Minimums: What Still Applies
Portland parking minimums are gone, but bike parking, access and other rules remain. See what applies October 8, 2026, and what changes in November.
A clearer view of housing.
Oregon middle housing land division enables separate ownership. Check unit limits, utility and easement rules, and the steps from approval to recording.
An Oregon middle housing land division lets eligible homes be sold on separate lots. It does not automatically authorize another dwelling on each new lot. The housing type approved for the original property remains unchanged, and the new boundaries must account for building-code compliance, utilities and access. ORS 92.031, as amended in 2026
The process originated with SB 458 in 2021. This guide reflects the law as of September 17, 2026, including subsequent amendments.
Start with the original property's zoning and permitted development. The statutory route covers parcels where middle housing is allowed under ORS 197A.420(2) or (3), or 197A.421. These provisions concern qualifying urban residential land; they do not establish a general right to divide rural lots. Housing types include duplexes, triplexes, quadplexes, cottage clusters and townhouses, with provisions for qualifying retained housing and accessible or affordable bonus units. Oregon's middle-housing statutes
Confirm local implementation before relying on an expanded housing allowance. HB 2138 gives cities until January 1, 2027, to implement specified expansions, and until January 1, 2028, for its cottage-cluster changes. In September 2026, a newly expanded definition or bonus may not yet apply to the property. HB 2138, sections 1–4
An application ordinarily must provide exactly one dwelling per resulting lot. Exceptions cover common-area lots or tracts and qualifying retained housing under ORS 197A.420(4): an existing house with an accessory dwelling unit (ADU), or an existing duplex, can remain together on one resulting lot. The retained-housing exception does not give every buyer permission to add another unit. ORS 92.031(2) and (4)
State law allows cities and counties to prohibit or impose approval criteria on new ADUs and subsequent middle housing land divisions. That authority has limits: restrictions must stay within the governing statutes and preserve the ability to create housing at or above the land's minimum zoned density. A statewide statement that ADUs are always forbidden would therefore overstate the law. ORS 92.031(3), (5) and (6)
For acquisition analysis, distinguish the number of saleable lots from the number of permitted homes. A larger backyard on one new lot is not evidence of additional development rights.
The proposal must satisfy applicable land-use regulations for the original parcel and the Oregon Residential Specialty Code. The application must also demonstrate building-code compliance in relation to the new property lines. Land-division approval does not replace building review. ORS 92.031(2)
Portland illustrates the distinction. Its Chapter 33.253 applies zoning regulations to the resulting lots collectively, including measuring zoning setbacks from the original site's boundaries. It preserves the development's housing type and expressly prohibits ADUs and further division of resulting lots. Read those local provisions alongside the state-law qualifications above. Portland Chapter 33.253, effective June 30, 2022
A line that works under zoning and land-use rules may still require building-code analysis. Have the designer and building official evaluate the proposed boundaries before treating the lot layout as settled.
The amended state statute requires separate utilities other than water and wastewater for each dwelling. It allows the local government to require separate water and wastewater utilities too. Obtain the jurisdiction's service requirements before assuming existing connections can remain shared. ORS 92.031(2)(a) and (4)(g)
The application must propose necessary easements—rights to use or enter another lot—for these purposes under ORS 92.031(2)(c):
Portland's approval standards require verification of water, sanitary sewer and stormwater service availability. Its Private Plumbing Easements guide, approved May 29, 2024, provides for approved lines crossing other properties and shared sewers for middle housing land divisions when Environmental Services allows them.
Under that guide, a plumbing easement ordinarily must be at least 10 feet wide. It may narrow to 5 feet where installation and repair can occur without conventional open-trench excavation in the narrower portion; other reductions require an appeal. Reserve space for utility routing early in development and land planning, before fixing a compact site's layout.
Keep three milestones distinct:
These requirements appear in the 2026 amendments, sections 27–28 and ORS 92.025, 92.040 and 92.050.
The ordinary deadline for final-plat approval is three years after tentative approval. Effective June 5, 2026, the statute also allows a period equal to that allowed for a concurrently submitted plat or plan under ORS 92.044. Verify the applicable deadline in the project file. HB 4037, sections 27 and 31
Suppose an investor proposes an eligible fourplex and a division placing each home on its own lot. Assume the project receives the necessary approvals and the plat is recorded. The investor can sell the homes separately, but the split itself has not authorized four additional ADUs.
If a rear home's utility line crosses a front lot, the proposed easement must support access and repairs. Compare that route with an independent connection: a cheaper installation may leave future owners with more complicated maintenance responsibilities.
Budget for survey and plat preparation, application and recording charges, legal documents, utility work and any building modifications. Ask the local planner, surveyor and an Oregon land-use attorney to review the proposal and restrictions before committing to a purchase. Then use local housing research to test sale-price assumptions against the homes and ownership rights the project can actually deliver.
The division does not automatically authorize an ADU. ORS 92.031(6) lets local governments prohibit or impose approval criteria on new ADUs, subject to statutory limits and protection for minimum zoned density. Check the local rules and the original development approval. ORS 92.031 as amended in 2026
Potentially, if the property qualifies and the proposal satisfies applicable development, building-code, utility and easement requirements. Two existing dwellings alone do not establish eligibility or building-code compliance in relation to the proposed property lines. ORS 92.031
State law lets the local government require separate water and wastewater utilities for each dwelling. Those services are exceptions to the statewide separate-utilities requirement, so confirm the local requirements and any approved shared-service options. ORS 92.031(2)(a) and (4)(g)
Preliminary approval alone does not satisfy the recording requirement. ORS 92.025 generally prohibits selling a subdivision lot or partition parcel until the plat has been acknowledged and recorded with the county recording officer. Oregon's plat-recording requirement
Written by
The Housing Current Editorial Team
Editorial Team
Reporting, analysis, and practical explainers across housing markets, mortgage finance, real estate business, investing, policy, and homebuilding.
Portland parking minimums are gone, but bike parking, access and other rules remain. See what applies October 8, 2026, and what changes in November.
California SB 1116 lot averaging permits smaller parcels for eligible 2027 applications, while average sizes and other project requirements still apply.
Assess SB 9 on tenant-occupied property: check three-year rental history, protected-housing restrictions and the lot-split residence commitment.