A new home with a passive radon system still needs testing. Check equipment, fan activation costs, follow-up duties and the records to retain.
A passive radon system in a new home does not prove that the house has been tested or that its indoor radon level is low. The system gives soil gas a route to escape without a powered fan. EPA says testing is the only way to know whether a new house has a radon problem.
For buyers, buyer agents and builders, a complete handoff connects the installed equipment, test results and responsibility for any remaining work. Add these checks to your new-home purchase preparation.
Ask the builder to show you the labeled radon vent pipe and explain its route from beneath the foundation to its roof outlet. For a typical slab system, EPA describes a gas-permeable layer beneath the slab, plastic sheeting, sealed foundation openings, a vent pipe and an electrical connection for a future fan. Designs vary with the foundation.
An outlet beside a pipe shows preparation for a fan; it does not establish that one is installed. EPA’s activation bulletin illustrates the distinction. Resolve the equipment scope alongside other new-construction decisions, while specifications can still be clarified.
Schedule testing for after construction is complete, when proper test conditions can be maintained. EPA’s February 2020 technical bulletin recommends testing before occupancy. Its new-home guidance also calls for testing immediately after moving in, so put that check on the homeowner’s calendar.
These are highlights of EPA’s March 2024 testing checklist, pages 20–21, not a complete testing protocol. Coordinate remaining construction work with the tester.
Do not assume “radon-resistant construction” includes testing, a fan or a promised result. EPA’s buyer guide, page 8 recommends addressing testing and mitigation responsibilities in the purchase contract.
Before signing or amending the agreement:
EPA recommendations do not determine your builder’s contractual obligations. Ask a local real estate attorney to review unresolved terms, and confirm applicable requirements with the local building department or state radon office.
EPA recommends fixing homes at 4 picocuries per liter (pCi/L) or higher and considering reduction between 2 and 4 pCi/L. Below 4 does not mean risk-free. Have the tester explain the result and any confirmation needed under the applicable testing protocol.
A qualified radon contractor can assess the installed system and add a fan to make it active. Obtain a written scope; do not assume every pipe installation needs only a fan. EPA’s activation guidance recommends using a credentialed or licensed contractor as applicable to state requirements.
After activation, arrange another radon test. EPA’s 2025 consumer guide, page 13 recommends post-mitigation testing within 30 days of installation, no sooner than 24 hours after the system begins operating. It also recommends an independent follow-up measurement.
Keep installation plans and photographs, installer contacts and all test reports together with the signed allocation of responsibilities. Include correction invoices, operating instructions and warranties. Label each test by date, location, method and whether the system was passive or active.
For an active system, ask for a demonstration of its warning device and maintenance instructions. EPA’s operating guidance says the fan should run continuously and recommends retesting at least every two years.
For any unfinished work, record the responsible party, deadline and evidence needed to close the item. A fan invoice documents installation; the subsequent radon report records the measured indoor level.
Yes. A pipe or construction label cannot establish the indoor radon concentration. EPA recommends testing new homes. Ask for the test report and arrange testing if none exists.
EPA recommends reducing radon when the level is 4 pCi/L or higher and considering reduction between 2 and 4 pCi/L. A contractor should assess the existing system, and testing after activation should confirm the result.
Do not assume that responsibility follows from the phrase “passive radon system.” Check the purchase agreement, warranty and applicable local requirements, and put any negotiated testing and correction duties in writing.
Written by
The Housing Current Editorial Team
Editorial Team
Reporting, analysis, and practical explainers across housing markets, mortgage finance, real estate business, investing, policy, and homebuilding.
Buying a new NYC condo with a temporary occupancy certificate? Check unit coverage, expiration, renewal plans and written closing conditions.
A new home landscaping escrow can help address unfinished work. Check lender approval, funding, completion deadlines and release terms before closing.
Check condensation in your new home’s first winter: locate the moisture, learn ventilation controls, keep a useful log, and know when to call the builder.