2026 Housing Completions by Region: West’s Outsized Drop
Compare January–September 2026 housing completions by region: the West’s share of lost units exceeds its construction share, with sampling limits.
A clearer view of housing.
Compare 2026 single-family permits by region through October: the Northeast and West account for 55.8% of the decline, above their prior-year share.
Written by Oreste Friscira, Editor
The Northeast and West accounted for 55.8% of the national decline in single-family permits for January–October 2026, despite representing 27.2% of the comparable 2025 total. The breakdown by region, calculated from Census and HUD’s November 18 release, puts the South’s larger unit loss in context: its decline was smaller relative to its size. Authorizations establish permission to build; they cannot establish how many homes will reach the market.
The table uses the published year-to-date “1 unit” columns in Census Table 1b. Counts and losses are thousands of housing units authorized, without seasonal adjustment. Loss means fewer authorizations than in the same period a year earlier.
| Region | Jan.–Oct. 2025 | Jan.–Oct. 2026 | Units lost | Change | Share of 2025 U.S. total | Share of U.S. decline |
|---|---|---|---|---|---|---|
| United States | 786.3 | 753.5 | 32.8 | −4.2% | 100.0% | 100.0% |
| Northeast | 49.4 | 43.6 | 5.8 | −11.7% | 6.3% | 17.7% |
| Midwest | 108.8 | 108.3 | 0.5 | −0.5% | 13.8% | 1.5% |
| South | 463.5 | 449.4 | 14.1 | −3.0% | 58.9% | 43.0% |
| West | 164.6 | 152.1 | 12.5 | −7.6% | 20.9% | 38.1% |
Source: New Residential Construction, October 2026, Table 1b, PDF page 3. Changes and shares are our calculations from the displayed counts.
To reproduce the table:
Percentages are rounded to one decimal. Regional losses add to 32.9 thousand—5.8 + 0.5 + 14.1 + 12.5—against the published national difference of 32.8 thousand. Census cautions that rounded detail may not add to totals. Using the national denominator makes regional contributions sum to 100.3%; they have not been adjusted to equal 100%.
The South represented 58.9% of January–October 2025 authorizations but accounted for 43.0% of the national decline. Its 3.0% contraction was smaller than those of the Northeast and West, even though its larger starting volume produced the greatest absolute loss.
Together, the Northeast and West lost 18.3 thousand authorizations: (5.8 + 12.5) ÷ 32.8 × 100 = 55.8% of the national loss. Their matching baseline share was (49.4 + 164.6) ÷ 786.3 × 100 = 27.2%. Their contribution to the decline was therefore disproportionately large relative to their prior-year activity.
Use the contraction rate to benchmark a regional pipeline’s change. Use contribution to understand where the national reduction occurred. Confusing those measures can make the largest market look weakest simply because it starts with more activity.
October’s year-over-year comparison again shows the sharpest percentage declines in the West and Northeast. It also qualifies the Midwest’s nearly flat cumulative result: the region’s October rate was lower than a year earlier.
These are seasonally adjusted annual rates, in thousands, from Table 1a, with percentage changes calculated using the formula above.
| Region | October 2025 rate | October 2026 rate, preliminary | Change |
|---|---|---|---|
| Northeast | 58 | 47 | −19.0% |
| Midwest | 123 | 111 | −9.8% |
| South | 516 | 466 | −9.7% |
| West | 189 | 148 | −21.7% |
A seasonally adjusted annual rate removes estimated seasonal effects and multiplies the adjusted monthly value by 12. It describes that month’s pace; it is neither the number authorized during October nor a forecast for the full year. These rates must remain separate from the cumulative counts above.
Census’s single-family category includes detached houses and qualifying attached homes, including townhouses. “Privately owned” excludes government ownership; it does not mean owner-occupied. A permit records local authorization to proceed with construction.
The regional tables do not identify which projects will be delayed or abandoned, when homes will be completed, or whether they will be rented or offered for sale. They also cannot establish why permitting fell or predict local demand and prices. The distinction between permits, starts and later stages of the construction pipeline matters when assessing future competition.
For professionals, the next step depends on the decision:
Use Census’s published year-to-date totals rather than summing monthly rows: cumulative figures incorporate corrections that may not appear in those rows. Estimates include imputed activity for missing reports and places not surveyed monthly, and remain subject to reporting, coverage and processing errors. These limitations matter when interpreting small differences. Building Permits Survey methodology
This comparison preserves the November 18 release available as of November 22, 2026. Census’s release calendar lists revised October permits for November 25 and November New Residential Construction for December 17. The first revises the existing observation period; the second adds a new month.

Written by
Editor
Oreste Friscira is an editor at The Housing Current, covering real estate, mortgage finance, and construction. He brings decades of experience as an architect and has directed large-scale construction, maintenance, and conservation projects involving historic buildings.
Compare January–September 2026 housing completions by region: the West’s share of lost units exceeds its construction share, with sampling limits.
August 2026 housing completions fell. Compare single-family and multifamily delivery, sampling uncertainty, and the stock still under construction.
June 2026 completed new home inventory was 118,000. The reported 9.3 months of supply also included unfinished and not-started homes.